Location: Montrose, MI
Road Type: Unpaved Road
Year Constructed: 2021
Traffic Type: Residential and farming
This unpaved road in Montrose, MI was treated with Perma-Zyme and limestone. The limestone was imported during the application process and mixed in evenly. The roadway sees a variety of traffic ranging from residential to farming, the soil has hardened and decreased the dust substantially. By applying Perma-Zyme to the road the town of Montrose has been able to decrease their maintenance and the nearby homeowners have been satisfied due to less dust.